
- Company News
Rio Grande Bridge in Jamaica Completed and Accepted
With 22 months’ arduous efforts, the
The
After a careful site inspection, the Client announced on the site that the bridge passed the inspection and checking and was accepted. The Jamaican client was satisfied with the results of inspection and checking and highly appraised the overall quality of the project. He expressed his sincere gratitude towards those who took part in the construction of the bridge and hoped to further cooperate with FHEC.()