Tianjin Port Eat Jetty and Stacking Yard Works
Tianjin Port Eat Jetty and Stacking Yard Works including: south side wharf, north side wharf, north side cargo wharf renovation and expansion, and stacking yard. North side wharf is caisson gravity type structure. Foundation for caissons varying from -12.5m to -22m was consolidated by deep cement mixing method. The berth total length is 1122m. The contract duration was from May 1990 to Oct. 1993, and the contract value is RMB¥156,480,000.00.
North side cargo container wharf renovation and expansion works mainly consists of original 35# to 40# berths renovation works to accommodating 6th Generation cargo container ship. The proposed berths are 1202m long and 52 wide. The top level is +6.0m. The structure is high pile slab type. Contract duration started from Jun.8th 2002 to Dec. 5th 2003.
Eastside jetty works was awarded of National Zhantianyou Civil works Prize in 2002